Product Description:
item | value |
CNC Machining or Not | Cnc Machining |
Material Capabilities | Aluminum, Brass, Bronze, Copper, Hardened Metals, Precious Metals, Stainless steel, Steel Alloys, As your request |
Place of Origin | China |
Model Number | Turning Machining |
Keyword | cnc machining precision parts |
Process | cnc turning /cnc machining/cnc milling /lathe turning |
Material | stainless steel/aluminum/brasss |
Surface treatment | Powder coating,electroplating,oxide,anodization |
Drawing Format | STEP/3D/2D /PDF /Drawing |
Tolerance | precise cnc parts 0.01-0.02mm |
Equipment | cnc machining center/automatic lathe |
Finish | Matt/anodized/Polish |
Application | mechanical industry |
Service | Customized OEM Services |





Related Product:



Company Profile:
About us:
Guangzhou Riyi Metal Products Co., Ltd. is a professional manufacturer specializing in the production of enclosures, cabinets, racks, and various automated equipment sheet metal processing. The company is equipped with advanced technology and a full range of processing equipment, including various laser cutting machines, CNC machining centers, CNC bending machines, laser welding machines, and more. These meet production needs and ensure processing quality. The company's core values are "Focus on Quality, Efficient Production, and Dedicated Service." We adhere to customer requirements as the standard, cooperate hand in hand, and create a better future together!


Our customer:

Certification:

Production line:

Package:

Shipping:

RFQ:
Q1:What's kinds of information you need for quotation?
VMT: You can provide 2D/3D drawing or send your sample to our factory, then we can make according to your sample.
Q2: Can we sign NDA?
VMT: Sure. We never divulge customers' information to anyone else.
Q3: Do you provide sample?
VMT: Yes, we can provide you sample before mass order.
Q4: How can you ensure the quality?
VMT: We have profesional QC department to guarantee the quality.
Q5: Delivery time
VMT: If in Stock: around 3 days after payment. Mass production: around 15~25 days after receipt of deposit (Accurate delivery time depends on specific items and quantities)
Q6: How about the transportation?
VMT: You can choose any mode of transportation you want, sea delivery, air delivery or door to door express.